
40ft 3-Axle Skeletal Container Trailer
Light, strong and purpose-built for moving 20ft and 40ft containers.
- Axles3
- Container20ft / 40ft
- Twist locksStandard
Semi-trailers for containers, bulk, fuel and heavy plant
Trailers (semi-trailers) are towed units that carry cargo behind a tractor unit. We supply 3-axle container, flatbed, lowbed, tipper and tanker trailers, built to your specification.
Match your tractor with the right trailer. We supply a complete line of 3-axle semi-trailers, from skeletal and flatbed container carriers to tippers, lowbeds and tankers.
Built to standard or to your axle, suspension and tank specification, and shipped alongside your trucks so your fleet arrives matched, ready and easy to service.

Light, strong and purpose-built for moving 20ft and 40ft containers.

A versatile flatbed for containers and oversized project cargo alike.

Drop-side fencing that keeps bagged and palletised goods secure on the move.

The low-loader for serious plant, excavators, dozers and heavy machinery.

Hydraulic tipping for bulk aggregates and minerals, faster turnarounds, fewer trips.

Tall side walls that carry more loose and bulk cargo in a single load.

A lined tank engineered to transport acids and industrial liquids safely.

Pneumatic discharge that moves cement and powders cleanly and quickly.

Multi-compartment transport for fuel and oil, built to specification.

Lightweight aluminium construction for higher fuel payloads and lower running costs.
Axle make, suspension, tyres and tank specification are all configurable to order.
We supply 3-axle semi-trailers: skeletal and flatbed container carriers, side-wall (fence) trailers, lowbed (low-loader) trailers for heavy plant, tipper trailers, and fuel, chemical and bulk-cement tankers.
Yes. Trailers are built to your axle, suspension, tyre and tank specification and shipped alongside your tractor units so your fleet arrives matched and serviceable.
Both. Some units are available from stock, and the full range is available import-to-order in full container loads, configured to your exact specification (engine, cab, body and options).
Lead time depends on whether the unit is in stock or imported to order, and on your destination. We confirm an estimated delivery time on every quotation and handle structured, compliant importation through Rwanda's customs.

Tell us the model, quantity and destination, and we will send a quote. Delivered to Kigali, or anywhere across the region.